Solar Watch (all sorts of green tech too!)

  1. Seeo expects to start making 300Wh/Kg batteries by late 2015 – and 400Wh/Kg later. ┬áThat’s double existing ones!
  2. Nov. 2015: Andhra Pradesh tender for solar fetches record low of Rs.4.63/KwH. This makes imported coal based power costlier, domestic coal not too far away! Foxconn and Softbank (Japan) are in the consortium that won the bid. Softbank has committed $20b to Indian solar sector.

Leave a Reply

Your email address will not be published. Required fields are marked *